Emergency Escape Tunnel Refurbishment: Nickel Operations
Works undertaken for a West Australian nickel operation included the design and installation of a Multiplate system to reinstate structural integrity to the Stockpile Emergency Escape Tunnels (100m in total). Works also required the design and installation of a cathodic protection system and splash zone coating systems.