Repair of Drop Down Box: PNG

Extrin had been given a brief to prepare an in-situ repair methodology which could be applied externally to the vessel, allowing production to continue during the repair process. The repair methodology involved the injecting of a suitable material into the cavity and cracks within the concrete wall, from the external pit of the tank Drop Box. This method of repair has been used to plugs water leaks in high use traffic tunnels.